Skip to main content Skip to search Skip to main navigation Skip to B2B platform navigation
Events
Expert knowledge
Favourites
Your account
Shopping cart

SolarEdge CSS-OD 102 + TRI 90 kW/100 kW PV inverter + 100 S1000 optimisers

Art. Nr.: 15436
Battery type: LFP
Installation location: Outdoor
Usable capacity: 97.28 kWh
Power: 50 kW
Warranty: 10 years
Charging power: 50 kW
Discharging power: 50 kW
Communication: CAN/RS485
Commercial storage type: All-in-One
Prices are only visible to business customers upon successful registration.
  • Top-Deal
Product number: 15436
Prices are only visible to business customers upon successful registration.
  • Top-Deal
Product number: 15436
Description

100 kWh + 100 kW + 100 optimisers = 100% SolarEdge

!! ONLY 100 PACKAGES AVAILABLE !!

With this complete package, you’ll receive a tailored SolarEdge solution comprising a Commercial storage system, battery inverter, energy management system, a 100 kW PV inverter system and 100 power optimisers.

At the heart of the system is the SolarEdge CSS-OD with a storage capacity of 102.4 kWh and a 50 kW battery inverter. The storage system is designed for commercial and industrial applications and can be installed both indoors and outdoors.

On the PV side, the package is complemented by the SolarEdge Synergy System with 90/100 kW and 100 S1000 power optimisers. This creates a fully SolarEdge-based combination of PV generation, storage and energy management.

Note on commissioning: To ensure a smooth initial commissioning of the SolarEdge CSS-OD, SolarEdge recommends booking an appointment in good time using the following online form: Book an appointment with SolarEdge now

For the first installation of a SolarEdge commercial storage system (CSS-OD), installers receive free on-site support from a SolarEdge Field Service Engineer.

Requirements
: - Registration by email to css@solaredge.com stating your preferred date.
- Appointment arranged by the FSE.
- An IBN report must be signed during the first installation. This provides the installer with the certificate required to carry out the commissioning of further systems independently.

Important: Subsequent commissioning by SolarEdge is no longer free of charge and will incur a fee.

Energy meters and CTs are also required
:- SolarEdge energy meter with Modbus connection-
3x SolarEdge current sensor, type 100A SECT-SPL-100A-A
- 3x SolarEdge current sensors, type 250A
SECT-SPL-250A-A - 3x SolarEdge current sensors, type 1000A SECT-SPL-1000A-A

Your benefits:

  • 102.4 kWh Battery storage system
  • 50 kW battery inverter
  • 90/100 kW SolarEdge Synergy PV Inverter
  • 100 S1000 power optimisers
  • SolarEdge ONE controller for C&I
  • 100% SolarEdge components
  • Matched system components
  • Suitable for commercial and industrial PV and storage projects
  • Only a limited number available – whilst stocks last.

What’s in the pack

  1. Storage & energy management
    • 1× SolarEdge CSS-OD Battery Cabinet
    • 1× SolarEdge PCS050 Battery Inverter
    • 1× SolarEdge ONE Controller for C&I
  1.  
  2. PV system
    • 1 × SolarEdge Synergy Manager SE-TRI-RW00IBNM4
    • 3 × SolarEdge Synergy Unit SESUK
    • 100× SolarEdge S1000 power optimisers
Videos
Videos
  • Installation Video Part 1 - Mounting the Synergy Inverter
    The YouTube video has been blocked due to the cookie settings.
  • Installation Video Part 2 - Wiring the Synergy Inverter
    The YouTube video has been blocked due to the cookie settings.
  • Installation Video Part 3 - Pre-commissioning the Synergy Inverter
    The YouTube video has been blocked due to the cookie settings.
{ "controllerName": "Navigation", "isHome": true, "isAccountHome": false, "inServiceMenu": false, "homeLoggedOut": false, "breadcrumbLength": "0" }
SolarEdge CSS-OD 102 + TRI 90kW/100kW PV-WR + 100 S1000 Optimierer
SolarEdge CSS-OD 102 + TRI 90 kW/100 kW PV inverter + 100 S1000 optimisers